Our Recent Projects
EAST LOS ANGELES HIGH SCHOOL #1
Owner: Los Angeles Unified School District
General Contractor: Hensel Phelps
Program Size: $108,075,369
Contract Amount: $733,900
Change Orders: $1,177,770
Duration: 2 years
This project Alameda Construction Services, Inc performed site concrete for this project. This included topping slabs, site paving, steps, curbs, curb and gutter. City of Los Angeles street improvements.
This new high school is located at the corner of First Street and Mission Road approximately 2 miles east of downtown Los Angeles. The School provides a campus setting with a science focus in two distinct small learning communities. Amenities include classrooms and science labs, a library, multipurpose room, food service facilities, parent center, underground parking, competition gym and outdoor physical education facilities.
HENSEL PHELPS
Julio Vasquez
949 852-011
USC GALEN CENTER
Owner: University of Southern California
General Contractor: Clark Construction
Program Size: $147,000,000
Contract Amount: $1,401,000
Change Orders: $244,244
Duration: 2 years
This project Alameda Construction Services, Inc performed site concrete work. Site concrete included curb and gutters, sidewalks, tree well covers, stairs, trench drains, seat walls, ramp wall, ramps, aprons, light pole bases and City of Los Angeles street improvements.
The Galen Center a 255,000 square-foot arena with 10,258 seats, and utilize new locker rooms for home and visitors, as well as a state-of-the-art weight room and medical training room. An attached 45,000 square-foot pavilion contains additional practice room with three sections with enough space for 4 full basketball courts or 9 volleyball courts as well as seating for 1,000 – along with space for coaches and administrative offices.
CLARK CONSTRUCTION GROUP- CA LP
Jim McLamb
(714) 429-9779
DISNEY CARS LAND
Owner: Disney California Adventure Cars Land
General Contractor: Clark Construction Group-CA LP
Program Size: $200,000,000
Contract Amount: $623,680
Duration: 2 years
This project Alameda Construction Services, Inc performed site concrete work. Site concrete included pedestrian and vehicle paving, concrete band, brick paving sub-base, flagstone paving sub-base sub slab, topping slab and sealer and concrete curbs.
Cars Land is California Adventure Park’s newest themed land and the proud home to three newborn attractions, three restaurants and a coterie of shops.
CLARK CONSTRUCTION GROUP- CA LP
Jim McLamb
(714) 429-9779
GAS INFRASTRUCTURE PROTECTION PROGRAM
Owner: Southern California Gas Company
General Contractor: Alameda Construction Services, Inc.
Program Size: $5,000,000
Contract Amount: $1,310,000
Duration: 3/31/2013
This project s to Install and/or upgrade protection of above ground Gas Company facilities.
The project requires the installation of medium duty and heavy duty guard posts per Company Gas Standard and may require the removal and replacement of existing protection where upgrades are required.This work is being performed in Orange and Pacific Regions.
SOUTHERN CALIFORNIA GAS COMPANY
Laura Gomez
562 519-4640
EXPO PHASE 2 EXPOSITION LRT
Owner: Exposition Construction Authority
General Contractor: Skanska Rados, Joint Venture
Program Size: $1.5 billion
Contract Amount: $221,250
Duration: 2 years
This project Alameda Construction Services, Inc performed removal of asphalt, rail road tracks and ties.
Phase 2 of will connect the nearly complete light-rail line between downtown Los Angeles and Culver City to its terminus in Santa Monica. The Expo Line will bring more transportation options to Westside.
SKANSKA RADOS, JOINT VENTURE
Bill Dahlke
951 830-0309